Exhausting Work

Since I got my Stage 2 delivery I could start work on one of the major parts I had been waiting on, the exhaust.  And yes, I did go back and flip the muffler over so the tip was not so far out.     The Factory Five exhaust is all stainless steel and is […]

What a difference a day makes.

Yesterday stage 2 for my Hot Rod was delivered by FFR and Stewart Transport.  This shipment had some of the big parts like the body, doors, trunk, exhaust and several other things.  A fellow FFR builder came over and helped me get the car to the drive way and then on to the frame.  It […]

Lokar Shifter is done.

  So I have had the shifter for a while now and just now got it put into place.  This is the Lokar  ATS6700AN which is the Nostalgia Shifter designed for the 700R4 transmission. It has a mount that bolts to the tail shaft bolts of the transmission and a couple brackets on the side the […]

Ceramic Insulation Part 2

  I got up this morning while the weather was a bit cooler.  I started my day by grabbing the floor panels and firewalls and pulling the tape that was under the sound control spray and the ceramic hear insulation.  I did this so the sheet metal will rest right on the frame and not […]